Construction diary A4 30 days
Construction diary A4 30 days - Pcs (1) is backordered and will ship as soon as it is back in stock.
Product Details
Construction Site Diary for Documentation of Works
According to AB 04, the contractor is required to maintain a diary documenting circumstances that are important to the contract. The diary should include the following:
- Weather Conditions
- Workforce
- Directives
- Inspections
- Work Started
- Work in Progress
- Finished Work
- Deviations
- Disturbances
- Changes
The diary is maintained in report sets of three copies (original + 2 self-copying copies). Additionally, it includes the Protection Round Report, which is also kept in report sets of three copies (original + 2 self-copying copies).
Diary Specifications:
- Type: Diary for construction in blocks
- Binding: Glued edge
- Duration: 30 days
- Material: Carbon paper
- Format: A4
